|
|
MultiTek Strategic Solutions

MultiTek is your one-stop shop for all IT services related needs. Our ability to manage and execute at all levels of IT project work is truly unique in today’s marketplace. We specialize in the assessment, design, planning, management and execution of IT projects of any size and scope. Our dedicated professionals with countless years of experience can insure your IT project is performed on-time, within your budget and exceeds all your expectations.
Our experience is your advantage and services are offered at every level of project deployment to meet your needs. Our unique skills allow us to “jump-in” at any stage/phase of the project and assume responsibility for successful project execution.
| |
MultiTek
professionals will analyze your current environment. This includes all aspects of your IT infrastructure (hardware, software, network, desktop, and environmental). We will utilize automated inventory management techniques to provide you a complete snapshot of your IT environment.
Our personnel will assist you in identifying dependencies related to your project. Whether you need to relocate a data center (cross-town or around the Globe), consolidate into an existing data center, expand your data center, relocate to co-location facilities or merge your operations with another company, our services can ensure your IT project will proceed with skill and precision. We will provide you complete assessment documentation at the lowest level of detail required. This information will give your organization the framework for making key decisions as you proceed in your project evolution.
MultiTek personnel have years of experience in IT project work. Extensive Government consolidation background coupled with over 20 years of commercial IT experience provides you with the right resources to design your project.
Applying the framework gathered during the assessment phase, we will design solutions and strategies that will minimize your IT asset downtime, leverage your existing resources, and deliver at the performance level your customers and employees expect. We will draw upon our experts in network, hardware, and software to insure maximum availability and access to data while the project is underway.
Our worldwide agent and partner network will be utilized to promote rapid and effective project execution. Our Planners and Project Managers will work closely with your organization stakeholders to craft solutions within the confines of your operational and IT processing needs. We work with you to identify potential risks and gaps that need to be addressed and mitigated. The end result will be the delivery for approval of a full scale implementation plan that details every possible scenario to be followed in the execution of the IT project.
There is no substitute for proper planning in project related work. Our position is proper planning and due diligence greatly enhances the probability for success. As a result, our professionals place a premium on our ability to take a project design and plan for flawless execution.

Our experience is your advantage. The planning stage is heavily laden on communication. Project Managers will develop extensive communication plans and perform planning meetings on a frequent basis. Personnel will address issues, action items and other contingencies into a comprehensive strategy and will ensure all possible parties are communicated expectations and requirements.
Personnel will essentially operate as your employees throughout the project process. If necessary, we can perform mock projects to test our strategies and improve the project process. This is usually done as a benchmark step to any large project execution. These techniques are designed to meet your requirements and objectives and ensure your success.
In addition to the Project Management planning services, our personnel can provide a variety of other value-added services in advance of the project execution. These include items such as pre-cabling, rack placement, elevation drawings, raised floors, overhead conveyance systems, environmental testing, asset swaps, data migration, and much more.
The end result of comprehensive planning is successful execution. MultiTek prides itself on the successful execution of your projects. Our vast pool of resources and assets are brought to bear for execution of your project. Whether it occurs by air, ground, ship, or electronic data transfer, we have the infrastructure to support your project. We take great pride in our protection of your assets and resources. You can rest assured that our proven methodologies will result in your success.
We will deploy according to your schedule with all the proper personnel, assets and tools to complete the job. Our Project Managers and lead personnel will be in constant contact with your designated POCs to communicate execution progress and schedule. If we have performed the planning of your project, you will be able to track the project via checklist and schedule that illustrate the project flow.
Our superior communication will notify you of key milestones and turnovers points. Once complete, we will assist you in the testing and system assurance aspects of your project to ensure the deliverables and execution meet your criteria.
Other Services Offered
In addition to the complete project solutions offered above, MultiTek offers additional services:
- Media/Tape Relocation (add DOD standard wipe and/or encryption)
- Asset Recycling and Remarketing
- Transportation of IT assets
- IT Consulting Services
- IT Asset Scrap (same as recycling) remove
- Lease return
- Decommissioning of IT facilities
- Cable installation
- De-install/Install of complex IT assets
|
Return to Top
Return to Top
Medical relocations are some of the most demanding and complex projects. This is due to the 24x7x365 need for continuous care coupled with the human element of unpredictability and extensive specialized gear. As a result, these projects require planning, asset accountability, and flexibility for dynamic project changes and consideration for the needs of unique patient circumstances

MultiTek provide technical project personnel who are familiar with the medical industry and the unique needs of patients. MultiTek will assist in the planning, logistics, strategy, and availability needs of the medical institution. MultiTek can provide relocation of patient rooms, operating rooms, radiology, oncology, obstetrician, and high end MRI and scanners to support any medical relocation situation.
Our relocation of these complex items will be performed in a careful and systematic manner using specialized rigging and packaging. Medical project often require strategies of staging and systematic relocation based on departments.
Our personnel will work with hospital administrators to develop strategies that maximize access much needed healthcare applications, assets, and resources while maintaining the relocation schedules and timelines. This includes, pre-staging patient rooms, acquisition of pre-positioning beds, and asset solutions for high availability units such as scanners and MRI units. Similar to IT services, both complete and supportive services are available for medical relocation activities as well.
Return to Top
UniGroup's MultiTek offers relocation of laboratory and high value equipment to support those customers who need to move and require special care for their complex testing, IT and manufacturing equipment. These types of gear require the most delicate packaging and protection during shipment to maintain their system integrity. MultiTek can assist customer with total transportation and logistics services that insure these items arrive on time and in working order.
MultiTek can provide de-installation/installation services to handle even the largest units. Our technical leads will work with the customer to establish a timeline that meets the customer needs and provides adequate protection for the units during handling and transit. Complete and supportive services available.
Return to Top
MultiTek's expertise extends to assisting customers who require relocations services for their office/plant/facilities. Similar to IT, Medical, and Lab relocation offerings, these services are available in both complete and supportive packages to provide customers maximum flexibility. Movement of these facilities can be a short notice event and complex project. With MultiTek, we can take away the stress and strain via our experience and dedicated group of highly trained specialists who coordinate the logistics and transportation of your assets.
If you require a complete office/plant or facility relocation, let MultiTek apply its expertise to your project needs. This services includes de-installation and installation of office cubicles, personal affects, manufacturing systems, computers, robotics, inventory assets, phone systems, and much more.
Return to Top
Content coming soon!
Return to Top
- Customized packing, crating and loading for all types of gear
- Asset management services with computer related applications
- Assistance with import and export documentation problems
- Certificates of origin preparation
- Banking services
- Letters of credit
- Access to assets to minimize downtime
- Consulting services to design a seamless relocation plan
- Qualified operations staff available 24 hours a day, 7 days a week
- Air-ride trucking
- Climate controlled trucking
- Insurance coverage
- Detailed project plans and status logs
- Professional and courteous labor
Return to Top
- Hospitality (FF&E) Relocation: MultiTek completed a de-installation and installation of a twenty-five story, 5-Star Hotel within a period of 48 days. Each floor was unique in configuration and consisted of six different floor plans. The logistics of this project involved coordination of loading and unloading trucks of product on narrow, congested, downtown streets with limited space and parking. Loading and unloading had to be completed within a specified timeframe and within designated locations. The product was staged in limited areas and distributed while hotel and conference areas maintained full operation and schedules. Throughout the project MultiTek worked in conjunction with other tradesman to enable total refurbishment and meet the completion deadline. This often involved providing services around the tradesmen who were on activities on the same floor and rooms as the installers. The crew consisted of custom installers along with install moving teams that completed the installation of 410 rooms.
- Laboratory Relocation: MultiTek provided transportation, de-installation, and planning for an international laboratory relocation. The project included the relocation of multiple cryogenic freezers; lab equipment, office equipment and IT gear. The project required in-transit refrigeration of freezers up to 80 degrees below zero. Generator powered reefer trucks were supplied via UniGroup to maintain the required temperature. As with all projects UniGroup is uniquely positioned to provide turnkey solutions covering all aspects of a technical relocation project.
- IT Relocation: MultiTek assisted a large IT equipment manufacturer in the relocation of several hundred servers from one location to another local destination. As part of this project, UniGroup provided de-install and install teams working around the clock. Services included de-installation, packing, unpacking, and re-installation. Both servers and rack sliders were relocated and re-installed. The project occurred for two consecutive weekends and was successfuly completed on time.
- Medical IT Relocation: MultiTek provided relocation, de-installation and installation of a medical IT center over four phases. Required climate transportation was provided for the nearly 1000-mile journey. Technicians provided install and de-install services, as well as connectivity and power up.
- Co Location IT Relocation: MultiTek combined efforts with several data center relocations and their customers who needed to relocate their operations to co-location facilities. As part of this need, UniGroup MultiTek provided de-installation, installation, power down, spare parts, climate transportation and consulting services.
- Large IT Equipment Relocation and Removal: MultiTek provides de-installation, relocation, scrap and removal services for complex IT environment.
- Emergency Office and IT Relocation: As part of the aftermath to Hurricane Katrina, MultiTek relocated a U.S. Government entity that was displaced as a result of the storm. Services included climate transportation of several thousand IT backup tapes, relocation of IT equipment and servers, relocation of critical files, and relocation of personnel and their personal affects. The relocation was serviced to several different locales and areas. The project was completed in less than one week and allowed for the entity to regain operational continuity.
- IT Computer Room Cleanout: MultiTek has completed jobs that include a total cleanout of IT facilities to support customers who have consolidated or relocated operations. As part of the solution, UniGroup has scrapped, recycled, and disposed of IT equipment pursuant to customers' needs for privacy protection, and asset reuse.
- Backup IT Center Relocation: MultiTek met and discussed relocation services to a west coast based banking operation. The solutions required that UniGroup provided de-install services, packing, transportation, and armed security guard to protect the assets in transit. Additionally, using our fleet technology systems, the customer was able to track their shipments in transit and schedule personnel based on estimated arrival times.
- Medical Center Relocation: MultiTek has provided labor, transportation and project management services supporting several hospital relocation activities. Included in projects are installation services and deployment services to assist in getting the new hospital location up and running.
Return to Top of Page
|